Planning a Home Renovation in Swansea? Here’s the Order You Should Do Things In
- 4 Woods
- Jul 20
- 2 min read
Updated: Jul 31
Thinking about updating your home, but not sure where to start?
If you’re planning a renovation in Swansea or South Wales, getting the order right is one of the most important steps. Do things in the wrong sequence and you could end up spending more time, money, and energy fixing problems that could have been avoided.
Why Does the Order Matter in a Renovation?
Renovating a house whether it’s a single room or the whole property is a big project. If jobs get done in the wrong order, you can run into delays, extra costs, or have to redo work. Over the years, we’ve seen this trip up homeowners all across Swansea, Neath, Llanelli and beyond. Here’s our trusted step by step for a smooth build.
The Right Order for Renovating a House
1. Start with a Clear Plan
Before any work starts, have a plan for what you want to achieve. List your must haves and nice to haves, and get clear on your budget.
2. Get All Permissions & Designs in Place
If you need planning permission or Building Regulations approval in Swansea, get it sorted up front. Have your plans, drawings and any structural calculations ready.
3. Begin with Structural & External Work
If you need a new roof, windows, extensions, or any repairs to walls or foundations, do these first. This keeps the house weather tight and safe.
4. Major Internal Work Comes Next
This includes removing or building walls, new stairs, chimney removals and opening up rooms. Tip: Always get a trusted, qualified team for major changes.
5. First Fix Services, Electrics, Plumbing, Heating
Get all cables, pipes and ducting in place before plastering or flooring. This avoids having to rip things out later.
6. Plastering & Dry Lining
Once all first fix work is signed off, get walls and ceilings plastered. Now the space will start looking like a home again.
7. Second Fix Carpentry & Trades
Fit doors, skirtings, architraves, and any built in units. Also do electrical sockets, light fittings and plumbing fixtures at this stage.
8. Flooring & Finishing Touches
Lay flooring (timber, laminate, carpet, etc.) and complete painting or decorating.
9. Final Snags & Clean Up
Do a final walkthrough, check everything works as it should and sort any last fixes.
Common Mistakes to Avoid in Your Swansea Renovation
Starting decorating before first fix is complete
Fitting new flooring before plastering (dust and damage risk)
Skipping planning or “just seeing how it goes”
Not booking trades in advance (the good ones get busy!)
Need Help Planning Your Renovation?
At 4 Woods Carpentry, we help homeowners across Swansea and South Wales make their projects run smoother start to finish. We can advise on the best order, organise trusted trades and keep you updated every step of the way.
Want straight advice or a chat about your plans? Book Below